Iraq reopens Iraq–Turkey pipeline with 300,000-barrel daily export capacity

Iraqi Minister of Oil Basim Mohammed Khudair al-Abadi speaks during a press conference on November 27, 2026
Iraqi Minister of Oil Basim Mohammed Khudair al-Abadi speaks during a press conference on November 27, 2026

At a Glance

  • Iraq reopened the Iraq–Turkey pipeline with an initial capacity of 300,000 barrels per day.

  • Baghdad plans joint oil investments with the Kurdistan Region as national exports hit 3.6 million barrels daily.

  • Iraq is negotiating a higher production quota with OPEC after rejecting U.S. pressure to leave the group. 

Iraqi Minister of Oil Basim Mohammed Khudair al-Abadi announced on Friday that the newly reopened Iraq–Turkey pipeline has an initial export capacity of 300,000 barrels per day, with further increases expected in the coming days.


Key Statements and Focus Area

  • Basim Mohammed Khudair al-Abadi told a press conference that Iraq is currently exporting 3.6 million barrels of oil per day.

  • Al-Abadi said that Baghdad will invest alongside the Kurdistan Region in the oil sector to increase production levels.


During a visit to Kirkuk, al-Abadi inaugurated the IT1 pumping station and spoke to reporters, noting that Baghdad is holding talks with the Kurdistan Region.

He emphasized that the oil fields in the Region, Basra, and central Iraq belong to all Iraqis.

Al-Abadi stated that the ministry is awaiting court rulings regarding violations involving the oil pipelines.

The Oil Minister also announced that discussions are underway with BP to either renew or amend their existing contract.

According to the minister, Baghdad is holding talks with OPEC to raise production.

However, Reuters reported today that U.S. President Donald Trump's administration pressured Iraq earlier this year to consider leaving OPEC to expand oil output,

FYI

Friday's inauguration of the IT1 pumping station in Kirkuk marks the reactivation of the old 46-inch Iraq–Turkey crude oil pipeline route after a 12-year suspension caused by Islamic State militant attacks in 2014. 

Rehabilitated entirely by national engineering teams from the North Oil Company and the State Company for Oil Projects, the line transports crude from IT1 through the IT1A station to the metering station, with capacity projected to reach 500,000 barrels per day once a second pumping station is restored. 

The reactivated route provides Baghdad with a vital alternative export outlet to Turkey's Ceyhan port amid regional shipping disruptions in the Strait of Hormuz, complementing Iraq's August 2026 interim transit agreement with Ankara and its broader redevelopment contracts with BP across major Kirkuk oil fields.

Dive Deeper: Handpicked Stories for You

Follow Channel8 for continuous updates:

US Urged Venezuela and Iraq to Exit OPEC and Blocked Caracas Dues

Oil Ministry Denies Rumors That Basim Khudair Plans Resignation

Masrour Barzani Rejects Baghdad Centralism in Briefing with Diplomats

Daban Mohammed

Fri Nov 27 2026

Loading related news...